Technical Brief · ARG-BLC1 & HET-B1

Physics first. Machine learning second.

Every Cassandra model enforces physical heat-balance checks, blind out-of-sample uncertainty bands, and explicit honesty whenever internal BMS sensors are absent.

ARG-BLC1 Diagnostic Pipeline

Four verified stages turning raw BMS logs into an isolated mechanical work order.

Telemetry Hygiene Pre-Scoring Gate

Sensor & Meter Integrity Gate

Screens out standby noise, electrical meter dropouts, and evaporator temperature inversions before scoring — eliminating false alarms driven by faulty probes.

Meter Dropout Tolerance 0.0% unfiltered pass-through
Water ΔT Guard Automatic inversion rejection
Digital Twin Gray-Box Ensemble

Hybrid Thermodynamic Digital Twin

Pairs physical lift, approach ΔT, part-load ratio, and active compressor staging with stacked gradient-boosted and neural learners calibrated blind out-of-sample.

Blind Power RMSE (v4) 1.62 kW (6,531 OOS hrs)
vs. Legacy Gordon–Ng 3.0× tighter (4.90 kW)
Early Warning Conformal + CUSUM

Split-Conformal Bands & Page CUSUM

Constructs distribution-free P10–P90 efficiency envelopes and runs autocorrelation-adjusted Page CUSUM to confirm sustained mechanical degradation within days.

Clean Coverage 96.1% inside P10–P90
Detection Lead Time 3 days (92.6% breakout)
Causal Isolation Honest Uncertainty

Bayesian Root Cause & Sensor Reserve

Scores competing fault hypotheses against load-band power, suction/discharge pressure divergence, and twin-stage A/B switches — while explicitly reserving mass for missing sensors.

Unmeasured Sensor Reserve 15% explicit mass
Field Verification 15-min checklist→

HET-B1 Heating Programme

Three progressive engineering levels under development for industrial heat pumps, district heating, and boiler cascades.

HET-B1 Level 01 Observe

Trustworthy Operating Picture

Organise energy input, useful heat delivery, and source/sink temperatures while keeping telemetry gaps and uncertain readings explicitly visible.

Primary Output Heat-balance audit
HET-B1 Level 02 Investigate

Explain Changing Performance

Compare condition-matched operating regimes against an agreed baseline and present supporting evidence alongside ruled-out causes.

Primary Output Matched COP forensics
HET-B1 Level 03 Anticipate

Preventive Seasonal Planning

Track gradual efficiency drift across heating seasons so maintenance teams intervene ahead of peak winter demand.

Primary Output Pre-winter work orders
Inspect the pipeline live in HC-GATE → View Sample 1-Page Report (PDF) → Download Sample BMS CSV Template ↓ Discuss a Plant Pilot